How To Apply For MEPCO New Connection? Required Document For New Connection In 2024
Stop your further research about MEPCO New Connection because this article will take you through all the basic and important steps so that you will know how to apply for New Connection and why this change has occurred.

In this post, you will learn how to apply for MEPCO New Connection Online or by visiting their official office. If you are already a MEPCO customer, then you must check your latest bill from here
MEPCO New Connection
MEPCO New Connection is basically a name change of the existing connection or load reduction. You will be presented with a simple form to select the kind of electrical connection. Be sure to select MEPCO from the list of distribution companies. Complete the remaining fields, attach scanned copies of the necessary paperwork, and apply for a new connection.
You may discover detailed instructions on how to apply for a new connection by scrolling down to this article. Additionally, MEPCO Helpline Support is available to you 24/7 in case you have any difficulty or technical problems.
MEPCO New Connection Procedure
Suppose you are looking for an MEPCO New Connection Procedure for Online application from your comfort zone. In that case, you will be guided thoroughly in the steps below.
Some major steps should be taken while changing your MEPCO name to New Connection; they are as follows :

- Your personal details (name, CNIC number, address, etc.)
- Your property information (address, ownership status, etc.)
- Your desired load (in kW)
- Copy of your CNIC
- Copy of your property ownership documents (e.g., title deed, lease agreement, etc.)
- NOC from the relevant authority (if applicable)
- Demand Note (if applicable)
Load category | Processing fee |
Domestic (up to 5 kW) | PKR 1,500 |
Commercial (up to 5 kW) | PKR 2,500 |
Industrial (up to 5 kW) | PKR 3,500 |
Steps by Category and Projected Time
Based on the intended load, MEPCO has separated the new connection categories into three groups:
Category 1: Up to 15 kW (Domestic)
Category 2: 16 to 70 kW (Commercial and Industrial)
Category 3: 71 to 500 kW (Commercial and Industrial)
Depending on the category, different new connections have different processing times and costs. Category 3 connections are the most complicated and need the longest time to complete, whereas Category 1 connections are the easiest and fastest.
Category # 1
All users with electrical loads up to 15 kW fall under category one. The connection request for this category will be approved by the Assistant Manager Operation or SDO. Processing for Category One takes about 30 days.
On submission of the application form, the relevant office will issue a receipt. The office will also create a seniority register according to the date of application submission, and the applicant will have access to it. | 1 day |
The inspection team will inspect whether it is possible to set up the connection or not. The team will inform the applicant accordingly. | 3 days |
If connection setup is possible, costs will be estimated. | 2 days |
The applicant will receive the demand notice in person or by post. | 2 days |
The applicant will submit the receipt of the paid demand notice. | 2 days |
The applicant will submit Wiring Contractor`s Test Report. MEPCO office will verify it. | 3 days |
In accordance with the dues submission date, the office will prepare a priority list of applicants. | 1 day |
The office will issue the orders of service connection. | 3 days. |
The office will contact the store to provide the required equipment to set up the connection. | 3 days |
The store will provide the necessary equipment. | 5 days |
SDO / Assistant Manager will set up the connection after the availability of equipment. | 5 days |
Category # 2
All customers with electrical loads between 16 and 70 kW at 400 volts fall under category two.
The category two connection procedure at Mepco is identical to the category one process, although it can take up to 44 days for the Deputy Manager of Operation to approve the request.
Category # 3(71 to 500 kW / 400 volts)
Category two includes all consumers with electricity loads between 71 to 500 kW /400 volts. Mepco’s category-3 connection process is almost similar to category one’s but can take up to 73 days. The manager of Operation will approve the connection request for this category.
MEPCO New Connection Tracking
Whether you have applied for a new connection or a change of name, MEPCO tariff, or load, you may monitor the progress of your application. You must have the Tracking ID for your application, which you were given after submitting the application, in order to monitor it.
In summary
In conclusion, there are two methods of applying for MEPCO New Connection. It can be done either Online or by visiting any nearest center where you can directly register for your new meter.
To apply online, go to ENC’s official website and adhere to the previously stated procedure. You may follow your application and print the demand notice via the ENC website.